Parts processing steps

Parts processing steps

The first thing to do is to open the material. After opening, some small accessories, such as the production of small accessories, can go to the punching machine and then carry out Gong cutting or CNC processing. Computer gong processing, Dongguan computer gong processing, high-speed CNC processing, mechanical parts processing, CNC processing, this is a lot in the production of glasses accessories and auto parts. And do container: is to open the material punch after welding, and then sand after the oil spray, and then assemble the accessories can be shipped. And for hardware accessories, but also a lot of grinding after the surface treatment, electroplating or oil spray. Then welding or screw assembly packaging shipment.

All employees should check whether their clothes meet the work requirements before entering the work. Slippers, high-heeled shoes and clothes that affect safety are not allowed. Those with long hair should wear safety helmets. Computer gong processing, Dongguan computer gong processing, high-speed CNC processing, mechanical parts processing, CNC processing, keep correct posture, have enough spirit to cope with the work, and if you find that you are not feeling well, you should immediately leave the post and report to the leader. During operation, it is necessary to concentrate on the operation, and it is strictly prohibited to chat and cooperate with each other. The operator should not operate under the state of irritability and fatigue, so as to avoid accidents and ensure the safety of operation.

2、 Before the machine works, check whether the moving part is filled with lubricating oil, and then start and check whether the clutch and brake are normal, and run the machine tool at idle speed for 1-3 minutes. It is strictly forbidden to operate in case of mechanical failure.

3、 When replacing the mold, the power supply should be turned off first, and the moving Department of the punch should stop running before the mold can be installed and debugged. After installation and adjustment, manually move the flywheel for two times to check whether the upper and lower dies are symmetrical and reasonable, whether the screws are firm, and whether the blank holder ring is in a reasonable position.

4、 Only when all other personnel leave the mechanical working area and take away the sundries on the worktable, can the power supply be started to start the machine.

5、 After the machine is started, one person will transport materials and operate the machine. Other people are not allowed to press the electric building or step on the pedal switch board, nor can they put their hands into the mechanical working area or touch the moving parts of the machine with their hands. When the machine is working, it is forbidden to reach into the slider working area, and it is forbidden to take and place the workpiece by hand. The standard tools must be used when taking and placing the workpiece in the die. In case of abnormal sound or machine failure