On the operation steps of metal parts processing

On the operation steps of metal parts processing

On the operation steps of metal parts processing

On the operation steps of metal parts processing

1、 Before entering the work position, all employees shall check whether their clothes meet the work requirements. Do not wear slippers, high heels or clothes that affect safety. Those with long hair should wear safety helmet. Maintain a precise posture at work, and have enough energy to deal with the work. If you find any body discomfort, you should leave the job immediately and report to your boss. When operating, we must gather our thoughts, forbid chatting and cooperate with each other. Operators should not operate in the form of fidgety and tired, so as to avoid accidents and ensure the safety of operation.

2、 Before mechanical work, check whether the movable part is filled with smooth oil, then start up and check whether the clutch and brake are normal, and run the machine tool for 1-3 minutes without air, and it is forbidden to operate when there is any mechanical obstacle.

3、 When changing the die, first turn off the power supply. After the movable part of the punch stops running, start to install and debug the die. After the installation and adjustment is completed, move the flywheel by hand twice for trial punching, and check whether the upper and lower dies are symmetrical and correct, whether the screws are firm, and whether the blank holder is in the correct position.

4、 Only after the rest of the staff leave the mechanical work area and take away the sundries on the workbench can the power supply start the machine.

5、 After the machine is started, one person shall transport materials and operate the machine. The rest of the people shall not press the electric building or step on the foot switch board, nor put their hands into the mechanical working area or hit the moving part of the machine with their hands. When the machine is working, it is forbidden to extend the hand into the working area of sliding block, and it is forbidden to take and place the workpiece by hand. When taking and placing the workpiece in the die, the equipment conforming to the standard must be used. In case of any abnormal sound or mechanical failure, turn off the power switch immediately for inspection.

6、 When leaving work, turn off the power supply, and clean up the molding articles, leftovers and sundries on the position to ensure the working environment is clean and safe. The above operation procedures must be consciously followed. Do not operate in violation of regulations. In case of any obstacle, cooperate with the maintenance staff for inspection. In case of any event, cut off the power supply immediately, and keep the site report to the factory Department for handling. The party concerned shall bear all the consequences of violating the operation procedures